How long does it take to build a website?
At DN Studio a one-page website takes 2 weeks, a 5 to 10 page business website 4–6 weeks, an online store 5–8 weeks and a cinematic 3D site 6–10 weeks; a client portal takes 8–14 weeks. Across the market, Clutch reports that most web design projects it reviews last 7 months and web development projects about 9.
Website timelines by type
These are our real timelines, from a signed plan to launch. Each comes with a fixed price in writing, so the date and the price are agreed together, before you pay anything.
The time depends far more on what the site has to do than on how many pages it has. A store needs products, checkout and testing of every payment path; a portal needs sign-in, roles and a staff side that really works.
| Website type | Time | Price | What sets the time |
|---|---|---|---|
| One-page website | 2 weeks | $5,000 | One landing page with custom design, custom copy and a form or booking link. |
| Business website (5–10 pages) | 4–6 weeks | $7,500 | A design system across 5–10 pages, motion, custom copy and structured data. |
| Online store | 5–8 weeks | $12,000 | Store design, product pages, bundles and checkout on your own payments. |
| Cinematic site | 6–10 weeks | $15,000 | A hero film made for the site and a 3D scroll system, on top of the business site. |
| Web app or client portal | 8–14 weeks | $35,000 | Sign-in and roles, an admin dashboard and up to 3 integrations. |
| Booking or quote system with your site | Set after a call | Custom quote | How your team takes jobs today. |
What the market says
Clutch publishes project lengths from verified client reviews. According to Clutch, most web design projects reviewed on its site last 7 months, and the typical web development project and the typical e-commerce development project each run 9 months.
Those figures cover every project type and size in Clutch's reviews, so they include large builds and long engagements, not only small business sites. Use them as a reason to ask questions, not as a target: ask any studio for a dated plan with a launch week in writing.
| Project type | Typical length |
|---|---|
| Web design project | 7 months |
| Web development project | 9 months |
| E-commerce development project | 9 months |
Where the weeks go
Every DN Studio project follows the same six stages. The early ones are short on purpose: a clear brief and a fixed plan save more time than anything that comes after.
Design and build overlap: the design is approved in week one, and the build runs from week 1 to week 10, depending on the project.
| Stage | What happens | When |
|---|---|---|
| Brief | One page: the goal, the audience, where it will run. | Day 1 |
| Plan and price | One plan and one fixed price in US dollars, before you pay anything. | Days 1–2 |
| Design | The look and the screens, approved before production. | Week 1 |
| Build | Code, content and film, tested on real devices. | Weeks 1–10, by project |
| Review | You use it and tell us what to change; rounds are in the price. | Each stage |
| Launch and care | Go-live, then 30 days of aftercare and an optional monthly plan. | After approval |
What slows a website project down
Most delays are avoidable, and most of them happen outside the code. These are the ones to plan for before the project starts.
Our one-page and business websites include custom copy, so the words are part of the plan rather than a task waiting on you.
- Content that arrives late: product details, prices, photos or approvals.
- Feedback spread across several people, with no one who decides.
- New features added after the plan is signed.
- Logins for the domain, hosting, payment or email accounts that nobody can find.
- Integrations with tools whose owners are slow to give access.
- Legal text, such as an age gate or a privacy policy, written at the last minute.
After launch: when Google shows the site
Launch day is not the day customers find you in search. According to Google's SEO starter guide, some changes take effect in Google Search in a few hours and others take several months, and Google suggests waiting a few weeks before judging whether a change helped.
The same guide covers two ways to help Google find a new site: submitting a sitemap, and checking how Google sees a page with the URL Inspection tool in Search Console. On our sites every word is in crawlable HTML with structured data that matches the page, so nothing is hidden from search tools.
How to get a dated plan
Every DN Studio project starts the same way, and you pay nothing until the price is fixed in writing.
Send the brief with your launch date and the reason it matters, such as a season, a product launch or a trade show. If the date cannot be met, the plan will say so before you pay anything.
Every option, with its price and timeline, is on /services/websites/.
- Send a brief at /contact/: what it must do, your company and your email.
- Get one plan and one fixed price in US dollars, in writing.
- One invoice in US dollars, paid in full before work starts, by card or bank transfer.
- We build, test against the DN Standard and launch on your own accounts.
Questions
- Can a website be built in a week?
- Some template sites can. Our fastest option, the one-page website, takes 2 weeks and includes custom design and custom copy.
- How long does a 5-page website take?
- Our business website, with 5–10 pages, takes 4–6 weeks and costs $7,500.
- How long does it take to build an online store?
- Our online store takes 5–8 weeks and costs $12,000. According to Clutch, the typical e-commerce development project in its reviews runs 9 months.
- Does a 3D website take longer to build?
- Yes. Our cinematic site, with a hero film and a 3D scroll system, takes 6–10 weeks, compared with 4–6 weeks for a business website.
- How long does it take to build a booking system?
- The booking or quote system with your site is a custom quote, with the timeline set after a call, because it depends on how your team takes jobs today. A client portal takes 8–14 weeks.
- How long does a website redesign take?
- We quote a redesign as one of our four website options, so it takes the same time: 2 weeks for one page, up to 6–10 weeks for a cinematic site. See /guides/website-redesign-cost/.
Sources
- Clutch, Web Design Pricing Guide (updated September 21, 2026; checked November 25, 2026)
- Clutch, Web Development Pricing Guide (updated November 12, 2026; checked November 25, 2026)
- Clutch, E-Commerce Website Development Pricing Guide (updated September 21, 2026; checked November 25, 2026)
- Google Search Central, SEO Starter Guide (updated December 10, 2025; checked November 25, 2026)
One plan and one fixed price in US dollars, in writing, before you pay anything.
Start a project